S-80

Blocks Fabrication and erection.

Client: Navantia
Propietary: Spanish Army
Duration: 30 months
Date: 2009/12
JASMINE

Fabrication and erection.

Client: Dragados Offshore
Propietary: Conoco Philips
Duration: 18 months
Date: 2011/12
EKOFISK

Estructural fabrication & erection.

Client: Dragados Offshore
Propietary: Conoco Philips
Duration: 18 months
Date: 2011/12
CASTOR

Estructural fabrication & erection.

Client: Dragados Offshore
Propietary: KIEWIT
Duration: 12 months
Date: 2011/12
POV C/505-506-507-508

Blocks Fabrication.

Client: Navantia
Propietary: Venezuela Army
Duration: 12 months
Date: 2010/11
BAM C/511-512-513-514

Blocks fabrication.

Client: Navantia
Propietary: Spanish Army
Duration: 12 months
Date: 2010/11
C/ 509-510 ROLL ON-ROLL OFF

Estructural fabrication, erectiond and welding.

Client: Navantia
Propietary: Acciona Transmediterránea
Duration: 24 months
Date: 2008/2010
BARCAZA

Estructural fabrication, erection and welding.

Client: Navantia
Propietary: Navantia
Duration: 6 months
Date: 2008
C/ 107 BAC

Estructural fabrication, erection and welding.

Client: Navantia
Propietary: Spanish Army
Duration: 12 months
Date: 2007/2008
ADRIATIC LNG

Natural Gast Tank Piping supports erection.

Client: Dragados Offshore
Propietary: Exxon-Mobil
Duration: 12 months
Date: 2007
C/ 108-109-110

"Previas", pannels, subblocks and blocks cutting and pre asssembly in our facilities.

Client: Navantia
Propietary: Vulcano
Duration: 18 months
Date: 2006/07
HAMMERFEST

Fabrication and assembly of SUB-ESTATION, such an architecture, Conditioned Air, Data Floor, etc.

Client: Dragados Offshore
Propietary: STATOIL
Duration: 16 months
Date: 2004/05
KRISTIN

Assembly of the Flare Tower.

Client: Dragados Offshore
Propietary: STATOIL
Duration: 12 months
Date: 2003/04
SAHNA

Fabrication and assembly of two Jackets (DPP and WPA Platform). Seafastening of the structure.

Client: Dragados Offshore
Propietary: CHEVRON-TEXACO
Duration: 5 months
Date: 2003
IPC-78 B

Fabrication of Control Room.

Client: Dragados Offshore
Propietary: PEMEX (PETRÓLEO DE MÉXICO)
Duration: 5 months
Date: 2002
NEW FABRICATION SHIP CONSTRUCTION C/87-103-105

Fabrication and assembly of blocks, Assembly of piping, Assembly of welded mechanical couplers for membrane-type cargo contention system and Stainless Steel Main Structure.

Client: Navantia
Propietary: ELCANO, KNUTSEN O.A.S., F.TAPIAS
Duration: 24 months
Date: 2001/03
SNORRE B

Fabrication of the semisubmersible hull.

Client: Dragados Offshore
Propietary: AKER MARITIME KVAERNER OIL & GAS
Duration: 12 months
Date: 1999/2000
THE ORESUND LINK

Fabrication and assembly of an approach bridges superestructure (49 spans).

Client: Dragados Offshore
Propietary: ÖRESUND KONSORTIET
Duration: 24 months
Date: 1997/99
PETROBAS-26 SEMISUMERSIBLE UNIT

Assembly of Pontoon, Fabrication and Assembly of Flare Tower and Fabrication and Assembly of Carbon and Stainless Steel piping.

Client: Navantia
Propietary: PETROBAS
Duration: 14 months
Date: 1996/97
MONGSTAD

Fabrication and assembly of main structure, piping and equipment of Process Module.

Client: Dragados Offshore
Propietary: Statoil
Duration: 22 months
Date: 1987/88
BRITANNIA DEVELOPMENT INFIELDS FACILITIES

Fabrication and assembly of Jacket for North Sea.

Client: Dragados Offshore
Propietary: Britannia
Duration: 18 months
Date: 1996/97
SCOTT UTILITY MODULE PROYECT

Manufacture and assembly of main structure.
Manufacture and assembly of stainless steel pipe.
A.A. System Mounting and Mechanical Completion.

Client: Dragados Offshore
Propietary: Amerada Hess Limited
Duration: 29 months
Date: 1990/93
JACKET BRUCE

Fabrication and assembly of turrets for FPSO.

Client: Dragados Offshore
Propietary: British Petroleum
Duration: 18 months
Date: 1991/92
JACKET OSEBERG

Fabrication and assembly jacket.

Client: Dragados Offshore
Propietary: Norks Hidro Statoil
Duration: 16 months
Date: 1989/90
NEW CONSTRUCTION 81/84/86 FERRY FOR SPANISH NAVY, FACTORY OF PUERTO REAL

Fabrication of blocks for the Curved Blocks Work Shop and Assembly in Dike of blocks of Machines area.

Client: Navantia
Propietary: Transmediterránea
Duration: 6 months
Date: 1999/2000
TRANSFORMATION OF SHIP F.P.S.O. P-47 FOR NAVY APANIARDS, FACTORY OF CÁDIZ

Fabrication, Assembly, Welding and Test of Pipes in room of machines and deck of the System Diesel, Inert Gas, Air of Instrumentation and open and closed Drainages.

Client: Navantia
Propietary: PETROBAS
Duration: 7 months
Date: 1999
NEW CONSTRUCTION B/QUÍMICOS 253/254/270/280

Welding of Blocks and welding of tanks os Stainless Steel 316L, as well as Assembly and Welding of the structure of Stern for blocks of the Construccion.

Client: Navantia
Propietary: Unión Naval de Valencia
Duration: 14 months
Date: 1998/99